You have no items in your shopping basket.
Order before 1pm for next working day delivery of in stock items! (Mon - Fri excl. Bank Holidays.) >>>> Got a question? Call our technical team on 01302 884385. Available 8:30am - 4:30pm, Mon - Fri excl. Bank Holidays. >>>> You can now download the Rendit App at the Google Play Store and Apple App Store! >>>>

Ecorend MR1 25kg Earth Taupe

This item will be factory made to order if not in stock.
£12.32 excl. VAT
Not in stock. (Pre-order now, Est. dispatch 7 days.)
Delivery Date: Pre-order, check ETA. (Read Order & Delivery FAQs.)
This product has a minimum order quantity of 40

PACK SIZE 
25kg Bag

FINISHING TOOL
Scrape Float

SUBSTRATE PRIMER
S10 or K11 (Dependent on substrate)

SUITABLE SUBSTRATE
Concrete, Clay, Lightweight Block and Brick Pot Life 1 Hour + Water Demand Approx. 4.5 - 5 litres per 25kg bag Ready to Finish 3-16 hours @ 5˚C - 25˚C

DESCRIPTION

Ecorend MR1 Earth Taupe is a through-coloured monocouche render that creates a warm, natural-looking exterior finish. Its muted taupe shade sits between brown and grey, making it well suited to properties where a softer, more earthy alternative to white or cream render is required.

Supplied as a cement-based powder, MR1 is mixed with water on site and applied in a one-coat, two-pass process. Once sufficiently firm, the surface is worked with a scrape float to produce an even, stone-like texture. The colour runs throughout the render rather than being added as a separate painted finish, helping to reduce ongoing exterior maintenance.

Earth Taupe can complement timber details, dark window frames, natural stone and other neutral building materials. The render can be applied manually or with a suitable spray machine across a range of prepared masonry backgrounds.

Key properties:

  • Warm taupe through-coloured finish
  • Produces a traditional scraped texture
  • Suitable for hand or spray application
  • Applied to 17mm and scraped back to 15mm
  • Water-repellent and breathable formulation
  • Strong adhesion to correctly prepared backgrounds
  • Suitable for concrete, clay, brick and lightweight block
  • Approximately one-hour working time
  • Supplied in a 25kg bag

Use Ecorend S10 Bonding Primer on concrete block or Ecorend K11 Key Coat Primer on clay, brick and lightweight block, subject to the condition of the substrate.

PREPARATION
All surfaces must be sound, clean, dry and free of any material which may impair adhesion. Do not apply to shiny surfaces. Scaffolding must be independently tied to allow for uninterrupted application. Any faults in the structure, particularly those which may lead to moisture penetration, must be rectified. Mask around the areas where material is to be applied. Masking tape must be removed before the material has dried out. Beads and expansion joints should be included as required by the substrate and BS standards and carried through all applied materials.

PRIMING
When applying to concrete block, prime with Ecorend S10 Bonding Primer When applying to clay, lightweight block and brick, prime with Ecorend K11 Key Coat Primer MIXING Ecorend MR1 Monocouche One Coat Render should be mixed with clean water at a rate of approximately 4.5 - 5.0 litres per 25kg bag using a suitable paddle or pan mixer. Mix for 2 minutes, allow to stand for 2 minutes then re-mix. This process allows the additives to dissolve and activate.

APPLICATION
To avoid dampness and discolouration rendering should be avoided below DPC or within 150mm of ground level. Ecorend MR1 Monocouche One Coat Render should be applied in a one-coat 2 pass operation to 17mm and finished to 15mm thick. The 1st pass should be applied to the primed substrate with a stainless steel trowel or spray pump, and for ease of application a serrated feather edge and finishing spatula will help. Apply the 1st pass to approx. 8mm thick with fibre-reinforcing mesh included in the 1st pass ensuring that the mesh is overlapped 100mm at the mesh joints. Additional fibre-reinforcing mesh stress patches of 500 x 500 mm should be added at all openings i.e. windows and doors, and also window reveals for additional substrate stress protection. The 2nd pass should then be applied to approx. 9mm thick, wet on wet to the 1st pass and levelled flat. Then leave the render to harden but not fully set for between 3-16 hours dependent on the temperature. This will allow the surface to harden, ready to finish once you can imprint your nail but not your thumb print, at this point the render is ready to scrape. Scraping should take place using a scraping float, scrape the surface in a tight circular action. It is essential that this operation is done carefully and evenly, the objective is to only remove 2mm from the complete surface. During the operation of scraping the render, use a straight edge to ensure any high spots are evened out. Immediately following the scraping process (preferably use a second man for this process), use a light soft brush to remove all loose material. Carrying out this process may highlight any un-scraped areas. Un-scraped areas must be scraped immediately to avoid colour variation that will occur if scraped when the product has started to set. Small blemishes or holes can be repaired at this stage by using material freshly scraped from the wall and pointed in. Once the product is fully scraped the minimum finish thickness should be 15mm. Specification Clauses relating to this product can be found in NBS Section M20 Rendering. BS 5262 Code of Practice for External Rendering and BS 8000-10 must be followed.

*
*
*

PACK SIZE 
25kg Bag

FINISHING TOOL
Scrape Float

SUBSTRATE PRIMER
S10 or K11 (Dependent on substrate)

SUITABLE SUBSTRATE
Concrete, Clay, Lightweight Block and Brick Pot Life 1 Hour + Water Demand Approx. 4.5 - 5 litres per 25kg bag Ready to Finish 3-16 hours @ 5˚C - 25˚C

DESCRIPTION

Ecorend MR1 Earth Taupe is a through-coloured monocouche render that creates a warm, natural-looking exterior finish. Its muted taupe shade sits between brown and grey, making it well suited to properties where a softer, more earthy alternative to white or cream render is required.

Supplied as a cement-based powder, MR1 is mixed with water on site and applied in a one-coat, two-pass process. Once sufficiently firm, the surface is worked with a scrape float to produce an even, stone-like texture. The colour runs throughout the render rather than being added as a separate painted finish, helping to reduce ongoing exterior maintenance.

Earth Taupe can complement timber details, dark window frames, natural stone and other neutral building materials. The render can be applied manually or with a suitable spray machine across a range of prepared masonry backgrounds.

Key properties:

  • Warm taupe through-coloured finish
  • Produces a traditional scraped texture
  • Suitable for hand or spray application
  • Applied to 17mm and scraped back to 15mm
  • Water-repellent and breathable formulation
  • Strong adhesion to correctly prepared backgrounds
  • Suitable for concrete, clay, brick and lightweight block
  • Approximately one-hour working time
  • Supplied in a 25kg bag

Use Ecorend S10 Bonding Primer on concrete block or Ecorend K11 Key Coat Primer on clay, brick and lightweight block, subject to the condition of the substrate.

PREPARATION
All surfaces must be sound, clean, dry and free of any material which may impair adhesion. Do not apply to shiny surfaces. Scaffolding must be independently tied to allow for uninterrupted application. Any faults in the structure, particularly those which may lead to moisture penetration, must be rectified. Mask around the areas where material is to be applied. Masking tape must be removed before the material has dried out. Beads and expansion joints should be included as required by the substrate and BS standards and carried through all applied materials.

PRIMING
When applying to concrete block, prime with Ecorend S10 Bonding Primer When applying to clay, lightweight block and brick, prime with Ecorend K11 Key Coat Primer MIXING Ecorend MR1 Monocouche One Coat Render should be mixed with clean water at a rate of approximately 4.5 - 5.0 litres per 25kg bag using a suitable paddle or pan mixer. Mix for 2 minutes, allow to stand for 2 minutes then re-mix. This process allows the additives to dissolve and activate.

APPLICATION
To avoid dampness and discolouration rendering should be avoided below DPC or within 150mm of ground level. Ecorend MR1 Monocouche One Coat Render should be applied in a one-coat 2 pass operation to 17mm and finished to 15mm thick. The 1st pass should be applied to the primed substrate with a stainless steel trowel or spray pump, and for ease of application a serrated feather edge and finishing spatula will help. Apply the 1st pass to approx. 8mm thick with fibre-reinforcing mesh included in the 1st pass ensuring that the mesh is overlapped 100mm at the mesh joints. Additional fibre-reinforcing mesh stress patches of 500 x 500 mm should be added at all openings i.e. windows and doors, and also window reveals for additional substrate stress protection. The 2nd pass should then be applied to approx. 9mm thick, wet on wet to the 1st pass and levelled flat. Then leave the render to harden but not fully set for between 3-16 hours dependent on the temperature. This will allow the surface to harden, ready to finish once you can imprint your nail but not your thumb print, at this point the render is ready to scrape. Scraping should take place using a scraping float, scrape the surface in a tight circular action. It is essential that this operation is done carefully and evenly, the objective is to only remove 2mm from the complete surface. During the operation of scraping the render, use a straight edge to ensure any high spots are evened out. Immediately following the scraping process (preferably use a second man for this process), use a light soft brush to remove all loose material. Carrying out this process may highlight any un-scraped areas. Un-scraped areas must be scraped immediately to avoid colour variation that will occur if scraped when the product has started to set. Small blemishes or holes can be repaired at this stage by using material freshly scraped from the wall and pointed in. Once the product is fully scraped the minimum finish thickness should be 15mm. Specification Clauses relating to this product can be found in NBS Section M20 Rendering. BS 5262 Code of Practice for External Rendering and BS 8000-10 must be followed.

Customers who bought this item also bought
A restoration and bonding mortar for the renovation of old hydraulic cement or lime based renders, sound or cracked but not delaminated, including render or masonry that has been painted or has received a thick textured coating system. Only the addition of clean water on site is required. Designed to create a new base coat render suitable for taking a range of decorative finishes including: Decorative coatings, decorative top coat renders and finishes.
£18.79 excl. VAT
This item will be factory made to order if not in stock.
£3.48 excl. VAT
This item will be factory made to order if not in stock.
£3.34 excl. VAT
EcoRend X32 One Coat Base is a cement based basecoat that has been highly polymer modified in order to offer improved adhesion, waterproofing and breathability. Coverage: Approx. 1.7kg per mm / per m²
£14.62 excl. VAT
This item will be factory made to order if not in stock.
£12.32 excl. VAT
Categories
Randomly Selected Banner